Stories

Media Release - Alice Springs can lead on energy transformation, but urgent investment needed: Roadmap Report

Mar 21, 2024

Alice Springs is lead­ing the way on ener­gy tran­si­tion with today’s release of detailed plans on how to adapt an elec­tric­i­ty grid for a renew­ables-dom­i­nat­ed future. 

The land­mark Alice Springs Roadmap to 2030 report explores the chal­lenges the Alice Springs ener­gy sys­tem faces, pro­vid­ing four pos­si­ble path­ways to achiev­ing the 50% renew­able ener­gy tar­get by 2030. It high­lights the oppor­tu­ni­ty for Alice Springs to con­tin­ue to lead in this space, pro­vid­ing Aus­tralia and the world with a post­card from the future’ on how pow­er sys­tems can be trans­formed to make way for high­er lev­els of renewables.

Read the Roadmap to 2030

More Info

Desert Knowl­edge Aus­tralia will hold an open event on 15 April from 5.30pm to cel­e­brate the end of the Alice Springs Future Grid project and pub­licly launch the Roadmap to 2030, includ­ing a sun­set tour of the Solar Cen­tre at the Desert Knowl­edge Precinct.

The Roadmap is one of the key out­puts from Alice Springs Future Grid, a three-year whole of sys­tem project iden­ti­fy­ing the bar­ri­ers to fur­ther deploy­ment of renew­able ener­gy in the Alice Springs pow­er sys­tem and find­ing solu­tions based on real-world tri­als, inves­ti­ga­tions, and mod­el­ling. It’s led by the Intyal­heme Cen­tre for Future Ener­gy, on behalf of Desert Knowl­edge Aus­tralia (DKA), with project part­ners Ekisti­ca, CSIRO, Pow­er and Water, Ter­ri­to­ry Gen­er­a­tion and Jacana Energy.

The report describes four sce­nar­ios that will get Alice Springs to the 50% renew­able tar­get by 2030, explor­ing dif­fer­ent vari­ables in the amount of cen­tral or decen­tralised renew­able ener­gy assets, and dif­fer­ent oper­at­ing modes for the exist­ing gas gen­er­a­tors. It also iden­ti­fies the​‘least regrets’ options rel­e­vant across all sce­nar­ios and rec­om­mends the next best steps to move this work for­ward. There will need to be sig­nif­i­cant invest­ment from pri­vate and pub­lic investors to car­ry out these plans, but this will be part­ly out­weighed by the reduced use of con­ven­tion­al gen­er­a­tion, the report says.

The cur­rent sys­tem was designed for con­ven­tion­al ener­gy gen­er­a­tion from diesel and gas, but the grow­ing input of rooftop solar sys­tems, cur­rent­ly esti­mat­ed to be 23 MW, is lead­ing to increased sys­tem volatil­i­ty as a result of instan­ta­neous renew­able con­tri­bu­tion exceed­ing 80% on a reg­u­lar basis. If this con­tin­ues with­out nec­es­sary upgrades, the reli­a­bil­i­ty of the ser­vice will be at risk. And this is just to adapt to cur­rent lev­els of solar input, let alone to account for renew­able lev­els of 50% and high­er. Cur­rent­ly, Alice Springs is pow­ered by 87% cen­tralised fos­­sil-fuel gen­er­a­tion, 9% house­­hold-gen­er­at­ed solar and 4% cen­tralised renew­able gen­er­a­tion.

This Roadmap recog­nis­es the chal­lenges we face. It accepts that changes must be made and pro­vides plau­si­ble path­ways to the future,” says Lyn­don Frear­son, Project Direc­tor Alice Springs Future Grid, and Man­ag­nig Direc­tor of Ekisti­ca.​“The chal­lenge for Alice Springs is not just its remote­ness, but also the lack of alter­na­tive ener­gy sources mean­ing that 50% renew­ables requires fre­quent oper­a­tion of the pow­er sys­tem at, or near, 100% instan­ta­neous renewables.

We think the Roadmap is a sem­i­nal piece of work that we hope many will be able to see and utilise both for the future of the Alice Springs pow­er sys­tem but impor­tant­ly for the future of pow­er sys­tems across the Ter­ri­to­ry and the rest of Australia.”

This Roadmap makes it clear; the sys­tem has to change. Whilst we’ve set out four pos­si­ble ways for­ward, we know that change will only hap­pen through col­lab­o­ra­tion,” says Jim­my Cock­ing, CEO of Desert Knowl­edge Australia.

The chal­lenges we are fac­ing as we move towards our goal of 50% renew­able ener­gy by 2030 are sys­tem chal­lenges, and any solu­tions need to be sys­tem solu­tions. All the key play­ers in the ener­gy sys­tem, includ­ing con­sumers, worked togeth­er in new and inspir­ing ways as part of Alice Springs Future Grid, and this must con­tin­ue if we’re to meet the chal­lenges ahead. This is a real oppor­tu­ni­ty for Alice Springs to come togeth­er, build momen­tum and con­tin­ue to demon­strate our place as glob­al lead­ers in this field.”

» Read the Roadmap to 2030 report

  • Exec­u­tive sum­ma­ry (p.7)
  • The rec­om­mend­ed three phras­es of tran­si­tion (p.53)
  • Pri­or­i­ty actions for stake­hold­ers (p.63)

» Read the Tech­no-Eco­nom­ic mod­el­ling report

» Explore fur­ther reports and results in the Knowl­edge Bank

Con­tact:

Lyn­don Frear­son, Alice Springs Future Grid Project Direc­tor, 0438 839 920, lyndon.​frearson@​ekistica.​com.​au

Jim­my Cock­ing, Desert Knowl­edge Aus­tralia CEO, 0423511931, jimmy.​cocking@​dka.​com.​au

Other Intyalheme Stories

Engaging the community with our renewable future

Apr 16, 2024

We invited community members out to the Desert Knowledge Precinct this month to hear about the work that’s gone into the Alice Springs Future Grid project.

Electric dream

Mar 19, 2021

Intyalheme Project Manager Hannah Farrow on her new experience: driving an electric vehicle.

A clean and connected energy future for Alice Springs

Aug 14, 2020

Lessons learnt during the Alice Springs Future Grid project will directly inform Australia's clean energy transition.